The reference plant in Weingarten (Baden) is the first time that the A.C.T. system has been integrated into an existing composting plant. This project is an important step for us, as it shows how the system can be integrated into existing structures in a practical way.
The following overview provides a compact summary of the key project data:
| Location | Weingarten (Baden) |
| Operator | MinERALiX |
| Treated material | Fine fraction of green waste |
| Treatment capacity | 4,000 t/a |
| Use of the A.C.T. system since | November 2025 |
| Type of use | Retrofitting in existing system |
| Number of A.C.T. rentals | 3 rents |
| Ventilation system | Pressure ventilation system |
| Additional equipment | A.C.T. wrapping device TM for membrane treatment |
The plant in Weingarten is an example of how existing composting sites can be further developed technically without having to carry out fundamental conversion work.

Since commissioning, the system has been working reliably and stably at the site. Integration into ongoing operations was implemented smoothly. The solution has proven itself in day-to-day operations, both on the operator side and from a technical perspective. The cooperation is constructive and based on partnership. All in all, a result that everyone involved is happy with.